The Ministry of Statistics and Programme Implementation (MoSPI) launched a State Dashboard on its eSankhyiki portal on 26 November 2026, developed with the Institute for Competitiveness. It brings together 283 indicators drawn from 21 statistical products across ten broad themes, including agriculture, education, work and wages, and gender and inclusion, so state-level data can be compared in one place. The eSankhyiki platform now hosts 43 statistical products, 1,109 datasets and more than 139 million records. The dashboard is linked to the VISTAR scheme for strengthening statistical systems, and extends MoSPI's push to make official sub-national statistics machine-readable and openly accessible.
GK ByteMoSPI's State Dashboard on eSankhyiki carries 283 indicators across 10 broad themesIndicators are drawn from 21 statistical products; the dashboard was developed with the Institute for CompetitivenesseSankhyiki now hosts 43 statistical products, 1,109 datasets and over 139 million recordsThe dashboard is linked to the VISTAR scheme for strengthening statistical systems
The Union Cabinet on 25 November 2026 approved continuing two Central Sector Schemes of the Department of Posts across the 16th Finance Commission cycle, FY 2026-27 to FY 2030-31. The Postal Operations Scheme gets Rs 1,141 crore for postal infrastructure, last-mile delivery, logistics and e-commerce, while the Estates Management Scheme gets Rs 1,491 crore for construction, reconstruction, renovation and uniform branding of post offices and staff colonies, and for preserving heritage postal buildings. The estates scheme earmarks Rs 100 crore for permanent infrastructure for the Centre for Excellence in Postal Technology (CEPT), Bengaluru. India Post runs about 1.65 lakh post offices, most of them rural.
GK ByteTwo Central Sector Schemes of the Department of Posts continued for FY 2026-27 to FY 2030-31 (16th Finance Commission cycle)Postal Operations Scheme: Rs 1,141 crore; Estates Management Scheme: Rs 1,491 croreRs 100 crore earmarked for permanent infrastructure for CEPT, BengaluruIndia Post network: about 1.65 lakh post offices, the majority in rural areas
The Ministry of Road Transport and Highways (MoRTH) revised the validity of Pollution Under Control (PUC) certificates by vehicle age, category and Bharat Stage emission norm through the Central Motor Vehicles (Sixteenth Amendment) Rules, 2026, which replaced Rule 115(7) and inserted Rule 115(7A) of the Central Motor Vehicles Rules, 1989. PUC certificates now remain valid three months for BS-I, BS-II and BS-III vehicles and six months for BS-IV. For BS-VI vehicles up to six years old, validity is three years for non-transport and two years for transport vehicles, falling to one year between six and ten years and six months beyond ten years.
GK ByteMoRTH revised PUC certificate validity under the Central Motor Vehicles (Sixteenth Amendment) Rules, 2026The amendment replaced Rule 115(7) and introduced Rule 115(7A) of the Central Motor Vehicles Rules, 1989, framed under the Motor Vehicles Act, 1988Validity is 3 months for BS-I, BS-II and BS-III vehicles and 6 months for BS-IV vehiclesBS-VI vehicles up to 6 years old: 3 years (non-transport) and 2 years (transport); 1 year for above 6 to 10 years; 6 months above 10 years
A national review of the SVAMITVA scheme in New Delhi on 20 November 2026, addressed by Panchayati Raj Minister Rajiv Ranjan Singh and Minister of State S. P. Singh Baghel, fixed 31 March 2027 as the deadline for saturation, with states asked to file time-bound action plans; ministers from nine states attended. Drone surveys are complete in 3.28 lakh villages and 3.47 crore property cards have been generated. Launched by Prime Minister Narendra Modi on 24 April 2020, SVAMITVA uses drones and GIS mapping to give rural households legal ownership records, and banks now accept the property cards as collateral for credit.
GK ByteSVAMITVA saturation deadline fixed at 31 March 2027 at the November 2026 national reviewDrone surveys completed in 3.28 lakh villages; 3.47 crore property cards generatedLaunched on 24 April 2020 by PM Narendra Modi under the Ministry of Panchayati RajBanks now accept SVAMITVA property cards as collateral for loans
The Union Cabinet cleared the VISTAR scheme - Develop India Initiative: Statistical Transformation, Analysis and Research - with an outlay of Rs 4,371.10 crore for five years, FY 2026-27 to FY 2030-31. Run by the Ministry of Statistics and Programme Implementation (MoSPI), it has three components: comprehensive statistical operations and ecosystem strengthening, which expands national surveys and brings in AI-based data processing; statistical strengthening support for States and Union Territories; and the 8th Economic Census, covering non-agricultural establishments. The scheme also funds improved survey methods, validation processes, university certification courses and steps to reduce collection bias in official data.
GK ByteCabinet approved VISTAR - Develop India Initiative: Statistical Transformation, Analysis and Research - on 4 November 2026 with a Rs 4,371.10-crore outlay for FY2026-27 to FY2030-31The scheme is implemented by the Ministry of Statistics and Programme Implementation (MoSPI)Its three components are statistical operations and ecosystem strengthening with AI-based processing, statistical strengthening support to States/UTs, and the 8th Economic CensusThe 8th Economic Census funded under VISTAR will cover non-agricultural establishments
The Centre extended the tenure of the high-powered task force on examination reforms, chaired by Infosys co-founder Nandan Nilekani, to January 2027 from end-October 2026, so it can consult states before reporting. The six-member panel - also S. Somanath, Tapan Deka, V. Kamakoti, Anita Karwal and Amrit Lal Meena - was constituted in July 2026 after the NEET-UG 2026 controversy, and covers the conduct, security, design and governance of public exams including the NTA's. It has logged over 50,000 suggestions and is weighing a national computer-based test centre network, a hybrid NEET-UG in 2027 and debundling exam stages. The digest carried its constitution in July.
GK ByteThe Centre extended the Nandan Nilekani-led examination reform task force's tenure to January 2027 from an end-October 2026 deadlineThe six-member panel also includes S. Somanath, Tapan Deka, V. Kamakoti, Anita Karwal and Amrit Lal MeenaIt was constituted in July 2026 following the NEET-UG 2026 controversy and covers conduct, security, design and governance of public exams, including NTA examsProposals under review include a national computer-based test centre network, a hybrid NEET-UG in 2027 and debundling exam stages across separate agencies